Enter your assignments and deadlines to see your daily workload and what to start first.

Four assignments due across two weeks feels manageable until you add up the hours. This planner takes your deadlines and time estimates, schedules them in deadline order, and tells you which ones cannot be finished at your current working rate — while there is still time to ask for an extension.

Your assignments

Assignments and deadlines

Estimate hours honestly — most students underestimate by roughly half.

hours
days

A buffer absorbs printing problems, portal failures and illness.

Everything is calculated in your browser. Nothing you type is uploaded or stored.

Result

Fill in the fields above and your result will appear here.

What the Assignment Deadline Planner does

The problem with assignment deadlines is that they arrive independently but compete for the same hours. Each one looks feasible on its own; together they may require more time than exists between now and the last due date.

This tool schedules tasks sequentially by deadline, which is the simplest workable rule for coursework, and reports the slack on each. Negative slack means it will be late, and that is worth knowing in week one rather than the night before.

How to use this tool

  1. Add one row per assignment with its name and due date.
  2. Estimate the hours each needs. Whatever you first think, adding half again is usually closer to reality.
  3. Set the hours you can genuinely work per day on assignments, separate from classes and exam preparation.
  4. Set a buffer so you finish a day or two before each deadline rather than at the last minute.
  5. Read the status column: anything marked "Will be late" needs a decision now, not later.

Formula and method

Tasks are scheduled in order of deadline. Finish day for task n = ⌈(Cumulative hours through task n) ÷ Daily capacity⌉ Effective deadline = Days until due − Buffer Slack = Effective deadline − Finish day Negative slack means the task cannot be completed in time at the current daily working rate.

Worked example

Example: three assignments, 3 hours a day

Lab record — 6 hours, due in 4 daysFinish day 2 — comfortable
Project report — 10 hours, due in 8 daysFinish day 6 — tight
Case study — 4 hours, due in 9 daysFinish day 7 — no margin

Twenty hours of work at three hours a day needs seven working days. It fits, but with almost nothing spare — one missed day and the last submission is late.

What your result means

Comfortable means three or more days of slack. Tight means one or two. No margin means any disruption causes a late submission.

Utilisation above 85% is the point at which a schedule stops being resilient. Below 70% you have room to absorb surprises.

"Will be late" is a prompt to act: raise your daily hours, ask for an extension early, or deliberately reduce scope on the assignment that carries the least weight.

Important considerations

  • Weight assignments by marks, not by size. A 20-mark project deserves more of your time than a 5-mark write-up that takes just as long.
  • Group assignments depend on other people. Add slack for coordination that you do not control.
  • Printing, binding, plagiarism checks and portal uploads all take real time and always fail at the worst moment. That is what the buffer is for.
  • Extension requests are far more likely to succeed when made early with a reason than the day before with an apology.
  • If several deadlines cluster, ask the department early — faculty often do not know what else has been set for the same week.

Limitations of this tool

  • It schedules strictly by deadline order, which is a reasonable default but not always optimal when marks differ sharply between assignments.
  • It assumes constant daily capacity, with no allowance for classes, labs or exams that vary through the week.
  • The output is only as good as your hour estimates, which most people underestimate.

Frequently asked questions

How do I decide which assignment to start first?

Deadline order is the safe default, which is what this tool uses. Override it only when one assignment carries substantially more marks or depends on someone else's input.

How accurately can I estimate assignment hours?

Poorly, in general — most people underestimate by 30–50%. Track the actual time for two or three assignments and use that ratio to correct your future estimates.

What should I do if the schedule is not feasible?

Act early. Raise your daily hours if you can, request an extension on the assignment where it is most likely to be granted, or deliberately limit scope on the one carrying the fewest marks. Doing nothing means the choice gets made for you.

Should I include exam preparation in this?
No — keep them separate and use the exam countdown planner for revision. Set your daily assignment capacity at what is left after study time.

Last reviewed: · Category: Students & Exams

This tool provides general information based on the values you enter. It is not professional financial, legal, tax or employment advice. Verify anything important against official documents or a qualified professional. Read the full disclaimer.